As an addition to this solar panel contract we were asked to provide edge protection to the dormer roof for the installation to be carried out. We erected an 8m long alloy beam to provide a double handrail to the flat roof area and installed toeboards to catch any falling materials. The access scaffold was then adapted to provide easy access on to the roof area. |












Sussex Scaffolding Ltd are proud to sponsor the Bognor Bird Man and ROX. See our