Sussex scaffolding erected this conservatory scaffold for the installation of solar heating on the high level roof line. We used 450mm deep alloy beams 6m long to allow access to be spanned over the glassed roof area with the top lift boarded and included edge protection to create a safe working area for the install. A ladder access point was also provided on this project. This scaffold had a scafftag installed as standard practice for our company and was handed over to the client following the scaffold inspection. |